• King's Golf course at Bled

Investment opportunities


Some countries are slow when it comes to selling their assets. Not Slovenia!

If you don’t want to miss a big opportunity, than Slovenian Sovereign Holding and the Slovenian “bad bank” are the right address for you.

Bail-outs of companies have added corporate equity to the privatisation portfolio managed by Slovenian Sovereign Holding or SSH (Slovenski državni holding). Thanks to transparent procedures and adequate asset sale pricing according to OECD principles and standards on the management of State Owned Enterprises, potential investors can enjoy good returns both from ownership and privatisation of management through well-structured concession transactions.  

For information about great untapped opportunities, visit the SSH website: https://www.sdh.si/en-gb/sale-of-assets

Slovenia’s economy has come a long way since the financial crisis bailout. Good news for potential investors is the asset portfolio of the Bank Assets Management Company or BAMC (Družba za prestrukturiranje terjatev bank) with bad loans on the books of the country’s banks in 2013/2014. For information on investment opportunities in BAMC’s portfolio of over 1 billion euros go to: http://www.dutb.eu/en/default.aspx

 

Below you will find investment projects offered by different entities. 

You may fine tune your search by selecting different categories of projects. 


Investment

Holiday Destination: Benedikt Thermal Spa Resort

Benedikt Thermal Spa Resort

Executive summary

A thermal spa resort including a large contemporary water park, a high-class hotel with an apartment village and a wide range of additional activities and benefits, such as thermal and mineral water use, organic food production, healing (medicianal) herb growing, footpaths for hiking, cycle lanes, agritourism, golf courses and similar facilities. The spa centre will be located in Benedikt, a village and municipality in north-eastern Slovenia, close to the border with Austria, in the vicinity of Maribor, Slovenia’s second biggest city, which has an international airport.

Current status

The project has been conducted and managed by our experts from the basic idea to its current phase. The parcel of 81,372 m2 and the spring/well have already been purchased. The spring Be-2 with thermal water erupts from a depth of 1,857 m with surface temperature of 72°C and the flow of 15 l/sec. The feasibility study has been prepared (by Vamed), the project drawings (PGD) and the documentation regarding the well has been made, other studies, analyses and spatial documentation have been carried out. The documentation for the issuance of the building permit(s) is complete.

Investment opportunity

There is an opportunity to purchase and finish the project, due to the need of liquidity to finance other projects by the developers. The developers are able to offer expert leading of the procedures, such as upgrading project documentation to implementation project documentation, consulting for obtaining concessions for the use of thermal water, consulting in the field of utilization of alternative sources of energy and designing structures in connection with rational use of energy, consulting for preparing optimal study of economical justification of the project implementation and consulting for acquiring grants from EU structural funds as well as mediation of contacts and information.

Investment required

The developer is prepared to sell the project for 5.0m euro. Until the recent phase 4.98m euro were invested, and the project is about to cost further 42.4m euro to finish. The entire project cost is therefore estimated to be 47.2m euro, with ROI and ROE after 20 years, NPV of 1.5m euro and IRR of 6.3%.

Likely percentage of bank finance available

Negotiations are taking place with some state owned banks to provide 40% LTV.

Advantages

Thermal water exploitation, unique location which is surrounded with breathtaking landscape which enables further expansion of services and the international visibility of the thermal SPAs in Slovenia.

Contact point

CMInženiring

Opekarniška 15a

3000 Celje

Tel: +386 3 4905 540

http://cm-celje.si21.com/CMI/

« Back